How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
人人妻人人澡人人爽人人精品浪潮| 日韩午夜福利无码专区a| 国产成人无码A在线观看不卡| 国产香蕉一区二区三区在线视频| 日本xxxx色视频在线观看 | 巨胸喷奶水www视频网站| 日韩a∨精品日韩在线观看| 久久精品无码一区二区软件| 亚洲av永久无码精品网站在线观看| 久久成人a毛片免费观看网站| 人妻精品丝袜一区二区无码AV| 国产三级韩国三级日产三级| 午夜福利理论片在线观看播放 | 97人人模人人爽人人少妇| 国产亚洲精品久久19p | 法国啄木乌av片在线播放| 东京热加勒比一区三区| 久久精品国产9久久综合| av无码中文字幕不卡一区二区三区| 欧美亚洲色欲色一欲www| 国产免费牲交视频| 色狠狠成人综合网| 久久精品中文字幕一区| 精品视频在线观看免费观看| 激情内射亚洲一区二区三区| 亚洲熟妇无码av不卡在线播放| 色香阁综合无码国产在线| 少妇厨房愉情理伦片免费| 精品无码日韩一区二区三区不卡| 亚洲国产日韩精品一区二区三区| 国产精品自在拍首页视频8| 99久久久无码国产精品6| 好爽好紧好大的免费视频国产| 中文乱码字慕人妻熟女人妻| 久久久精品2019免费观看| 国产精品一区二区三区不卡| 欧美黑人巨大videos极品| 麻豆第一区mv免费观看网站| 国内帅小伙自慰videogay| 亚洲欧美成人中文日韩电影网站 | 国产成人a在线观看视频免费|