一区二区三区国产亚洲网站|国产婷婷丁香五月缴情成人网|久久精品无码专区免费东京热|波多野结衣一区二区三区av高清

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
国产成人免费视频| 成年无码aⅴ片在线观看| 51国产黑色丝袜高跟鞋| 国产综合视频一区二区三区| 青青成线在人线免费啪| 国产精品乱码人妻一区二区三区 | 乱人伦中文视频在线| 少妇无码太爽了不卡视频在线看| 人妻少妇偷人精品无码| 精品性高朝久久久久久久 | 四虎影视在线影院在线观看免费视频| 亚洲中文字幕综合日韩| 欧美精品一区二区性色a+v| 男女猛烈激情xx00免费视频| 国产又黄又大又粗视频| 亚洲精品无码久久久久y| 成人黄色网址| 永久黄网站免费视频性色| 综合亚洲伊人午夜网| 国产成人精品综合久久久久| 久久久久久久97| 欧美成人精品高清视频在线观看| 日本japanese丰满少妇| 亚洲精品一区二区三区新线路| 日日噜噜夜夜爽爽| 成年日韩片av在线网站| 九九视频免费精品视频| 国产女人被狂躁到高潮小说| 亚洲午夜精品久久久久久app| 久久丫精品国产亚洲av| 中文字幕久久波多野结衣av不卡| 国产太嫩了在线观看| 青青小草av一区二区三区| 鲁死你av资源站| 日本一区二区国产精品| 97久久综合区小说区图片区| 亚洲精品在线中文字幕| 人妻熟妇乱又伦精品视频| 精品国产av色一区二区深夜久久| 午夜三级a三级三点在线观看 | 一区二区高清国产视频|